I'm working on some special effects in AE 11.0.2 (OSX 10.8, MP 2.66-Quad 16gigs of RAM). The native footage is MP4 at 29.97fps. These sequences will be placed in a PPro 23.976 Timeline. I'm going to have issues right? Should I re-intrepret my footage in AE to match my PPro Timeline?
I hope I haven't stepped in too much doo-doo. Many thanks!