All Comps in a project were 720p 25 fps There was one clip a piece of stock footage that was 24p so I retimed it because when I conformed it to 25p it was shorter in the timeline. I exported and reimported into the project. Now all the original footage (talent speaking to camera) is playing back really slowly like its being really slowed down?
I have seen that the RAM preview is down to 15 fps
Message was edited by: Kevin Monahan for legibility reasons.